¡ÚLTIMAS HORAS! Disfruta 1 año de Plus al 45% de dto ¡Lo quiero!

Podcast
Critical Path
48
0
Critical Path is a gaming podcast about Gaming, Culture and lots and lots of tangents.
Critical Path is a gaming podcast about Gaming, Culture and lots and lots of tangents.
Critical Path 076 - Bloody Brits
Episode in
Critical Path
We’re back! After a long hiatus, Stephen, Adam and Ran sit down to talk about the games we’ve played since the last proper episode, with special emphasis on Bloodborne.Hopefully, now we’ll get episodes out more consistently.
You can watch the video of this episode here: https://www.youtube.com/watch?v=75v1YKslLhg
And you can find the video for our 2014 Game of the Year discussion here: https://www.youtube.com/watch?v=reLzBghWQ18
01:47:49
Critical Path 075.5 - Ran’s Top 5 Games of 2014
Episode in
Critical Path
As promised, here’s Ran’s Top 5 games of 2014.
The list is limited because so was the year.
But what does that asshole know anyway?
Up next, Adam’s best games of 2014 list, and our yearly nuthouse of a GotY discussion! Keep tuned!
38:17
Critical Path 075.25 - Stephen’s Top 10 Games of 2014
Episode in
Critical Path
Heyyo! Games aren’t coming out much (Well, some are, but not near enough), so here we go, with a GoTY special. The big, hulking, Royal Rumble of a GoTY we do on Critical Path is still coming, but our personal lists are just as important to us.
So here’s Stephen’s list of his Top 10 Games of 2014!
Keep in touch, we’ll be sending more over soon.
37:56
Critical Path 075 - Ye Olde Space Truck
Episode in
Critical Path
Stephen’s back, joining Ran in talking about Elite: Dangerous and more Dragon Age: Inquisition.
We’re moving to www.criticalpathpodcast.com/feed, so point your RSS feed that-a-way.
In two weeks, we start our 2014 Top X lists. Stephen’s will be first, and Ran’s soon after.
Keep tuned. We’ll be back in force as soon as enough games are.
01:24:37
Critical Path 074 - Here Be Dragons
Episode in
Critical Path
Wait no more, Ran and Tom are here to discuss Dragon Age Inquisition, Assassin’s Creed Unity, Metal Gear Solid 4 and other current games.
I dunno, nothing’s come out in a while, and we did promise a Dragon Age episode, so there.
Keep tuned, we’ll have some more episodes in the coming weeks with the guys’ Top lists for 2014, and the ever-monstrous GotY discussion episode (which Stephen will host).
02:04:47
Critical Path 073.5 - Old Year’s End
Episode in
Critical Path
In this super-short episode, Ran says Happy Holidays.
Keep checking in, we’ll have a proper podcast episode for you very soon.
11:20
Critical Path 073 - First Time, Long Time, Double Time
Episode in
Critical Path
Come one, come all, as Ran (second time as host), Stephen (first time as guest) and Tom (fifth (?) time overall) talk about Super Smash Bros. U, Game of Thrones: Episode 1: Iron from Ice, and more!Also, awards happened , and news happened (because December? What the hell is going on!?)It’s 12/12/14 as we record, and, suitably we have some games to talk about, and three people to talk about them, and only two of us have played each one. So it’s either going to be great, or absolutely horrendous. I can’t tell which.
02:08:12
Critical Path 072 - They’re Ba-aaack!
Episode in
Critical Path
It’s been too long, but we’re back, with a new Critical Path Podcast episode!
Today’s cast members are Ran Harpaz and Adam Page, with a special Cameo by Stephen Gillespie (if I can get it working, that is), and the subject is going to be mainly about catch-up over the games released since mid-october, when we last ‘cast.
Also, because we haven’t done it in a while, news! And maybe some non-game related stuff.
Most importantly, the podcast is changing hands, with Ran taking over as host as Stephen steps back, at least for the time being. No worries, however, as Ran has decided on a specific accent to use, so we won’t have a repeat of The Episode That Shall Not Be Mentioned.
Hopefully.
03:02:49
Critical Path 071: The Shadow Remains Cast
Episode in
Critical Path
A couple of days late, but a special episode! For the first time, two podcast members are recording from the same location… Which has minimal impact on the proceedings apart from being kind of neat.
So what video games are Stephen, Ran and Adam going to talk about? Well, Shadow of Mordor mostly, and that really amazing Bayonetta 2 demo.
01:03:45
Critical Path 070: Destined for Greatness?
Episode in
Critical Path
Destiny came out. Stephen, Adam and Ran played it. They now want to talk about it a lot.
There’s some other stuff, but mostly Destiny.
THEY HAVE OPINIONS!
01:27:31
Critical Path 069: You know what we did last summer?
Episode in
Critical Path
We’re back form our summer holidays! Well, Stephen and Ran are anyway. They’ve been busy though, Stephen has a new console in his life and both of them have played video games. So stick around for Stephen doting on P.T, the pair falling head over heels for Rogue Legacy on Vita and having all kinds of opinions about Telltale adventure games.
01:32:37
Critical Path 068- The New Order
Episode in
Critical Path
Presented virtually without comment.
Circumstances shortened the podcast, but we’ll be back sometime late August. Meanwhile Ran is planning on streaming some things over on twitch.tv/criticalpathplays over the next few weeks, although the situation in Israel is putting a damper on things right now.
Have an awesome summer!
01:34:27
Critical Path 067- E3 2014 Part 2
Episode in
Critical Path
It’s still E3 2014 time! It’s part 2 of our press conference breakdown, this one focuses on Ubisoft, Sony and Nintendo.
01:29:25
Critical Path 066- E3 2014 Part 1
Episode in
Critical Path
It’s E3 time! Join Stephen, Ran, Daniel and Tom for a breakdown of all the big conferences. In this episode we have Microsoft and EA… Enjoy!
01:45:07
Critical Path 065- Wolfenstein Among Us
Episode in
Critical Path
The Critical Path Podcast is a gaming podcast for the moderately informed gamer. We talk about what games we’ve played since the last episode, what big news happened since the last episode, and whatever else comes to mind.This episode, expect talk of Wolfenstein: The New Order, The Wolf Among Us: Episode 4, and the upcoming E3.
01:53:24
Critical Path 064: Is Watch Dogs any good?
Episode in
Critical Path
It’s Stephen Gillespie and Adam Page only this week, but boy do they have games to talk about! Things start off with chat about inFAMOUS Second Son, but quickly move into new releases. Expect discussion and analysis of Transistor and a lengthy talk about that Watch_Dogs game that came out. Does it live up to the extreme hype, is it even good? Find out here!
01:07:52
Critical Path 063- Weird Games
Episode in
Critical Path
We have played some odd stuff recently, Conception 2 and Mugen Souls Z being prime examples. Stephen, Ran and Tom weigh in on these topics as well as talk a lot of Hearthstone, Nintendo news, discuss Broforce and find time to talk about Microsoft and its kinectless future. Enjoy!
02:31:32
Critical Path 062: Games Galore!
Episode in
Critical Path
Stephen and Ran are back, and they have video games to talk about!. Stephen bought a PS4, Ran played the new Spider-Man. Oh, you want more? Well how about extended discussion on Hitman GO, Trials Fusion and Child of Light? We’ve got that stuff also.
01:15:43
Critical Path 061: All the Bioshocks
Episode in
Critical Path
Stephen got round to playing Bioshock Infinite’s DLCs and him and Ran discuss them at length. There are some spoilery segments for episode 2, so if you don’t want to hear them skip a handful of minutes ahead at that point. You have been warned.
Also there’s talk on the new Wolf Among us episode, Stephen and Ran really liked it!
01:34:38
Critical Path 060: Reaper of Dark Souls
Episode in
Critical Path
Hello stranger! How would you like a talk about the new Diablo expansion, some more Dark Souls coverage, a discussion about the South Park video game and even some opinions on the new iOS game Monument Valley. Well! Stephen, Ran and Adam have that for you.
Stay a while and listen.
01:46:30
You may also like View more
Vis Ludica
Podcast sobre los nuevos juegos de mesa: eurogames, temáticos, simulación, wargames. Updated
Estamos al mando
Podcast sobre videojuegos en clave de humor. Noticias, debates y mucha locura, contestamos todos vuestros comentarios.
Updated
Rejugando
Videojuegos desde todos los ángulos
Repaso a la actualidad del videojuego, análisis, entrevistas y por supuesto videojuego clásico cada lunes y cada viernes en Ivoox. Updated



