Grenfell Phase 2 - Volume 2 - Part 3 - Chapter 25
Episode in
Fire Ninja
This episode looks at Volume 2 Chapter 25 of the Grenfell Phase 2 Inquiry report specifically;
Certification of Celotex RS5000 by LABC
A. Initial Contact with LABC
B. Registered Detail 491
C. Withdrawal and Reissue of Registered Detail Certificates for RS5000
19:26
Grenfell Phase 2 - Volume 2 - Part 3 - Chapter 25
Episode in
Fire Ninja
This episode looks at Volume 2 Chapter 25 of the Grenfell Phase 2 Inquiry report specifically;
Certification of Celotex RS5000 by LABC
A. Initial Contact with LABC
B. Registered Detail 491
C. Withdrawal and Reissue of Registered Detail Certificates for RS5000
23:03
National Association of Healthcare Fire Officers (N.A.H.F.O) Conference - 10th June 2025
Episode in
Fire Ninja
This is a live recording from the 10th June 2025 at the National Association of Healthcare Fire Officers.
With guests Peter Aldridge
Jim Miller
and
Jak Ryan
You can join NAHFO at https://nahfo.org
This years event was sponsored by Birmingham Dogs Home
www.birminghamdogshome.org.uk
31:32
Grenfell Phase 2 - Volume 2 - Part 3 - Chapter 24
Episode in
Fire Ninja
This episode looks at Volume 2 Chapter 24 of the Grenfell Phase 2 Inquiry report specifically;
1. Celotex RS5000 Insulation
A. Introduction
B. Background
i. Key Personnel & Management
ii. The Acquisition by Saint Gobain
iii. Lambda Values
iv. The Change of Polyol
C. The Development of RS5000
i. Genesis of the "Above 18m Project": 2008 - 2012
ii. Allocation to Jonathan Roper: 2012 - 2013
iii. June 2013: Business Case
iv. Celotex's Investigations during 2013
v. Sotech and IFC: June - October 2013
vi. Discussions with BRE: May and October 2013
vii. The Roper-Evans Exchange: 1st November 2013
vii. 4th November 2013 Meeting - The 5 Options
viii. The Decision to Proceed
ix. Designing the Test
x. The First Test: 14th February 2014
xi. Reaction to the First Failed Test
xii. Decision to Restest
xiii. Design Changes
xiv. No New Drawings
xv. Source of Materials
xvi. The Second Test - May 2014
xvii. BRE's Knowledge of the Design Changes
xviii. Decisions Following the Second Test
xix. The Slide Show
xx. Instructions to Produce Slides "For General Business Use"
D. BRE Draft Report
i. Discussion of the Draft Report
ii. Decision not to Correct the Report
iii. Request to Remove Figure 18
iv. Internal Review and Issue of the Report
v. Mr Clark's Involvement in the BRE Test Report
vi. The RS5000 Classification Report
vii. The Abridged Report
viii. The Marketing of RS5000
ix. The RS5000 Marketing Literature
x. The Compliance Guide
xi. The Specification Guide
xii. Other Marketing Documents
xiii. Internal Launch of RS5000
E. Aftermath of the Launch
i. Relations with NHBC
ii. Problems in the Market
iii.LABC Approval
iv. Handover to Debbie Berger
v. Contact with BRE
vi. February 2015: Market Analysis Slideshow
vii. Desktop Study (March 2015)
viii. Exova's Draft Report
ix. NHBC's Reaction
Don't forget to visit www.fireninja.info and subscribe to the newsletter for a chance to win a VIP ticket to the Fire Safety Event 2025.
01:50:08
Grenfell Phase 2 - Volume 2 - Part 3 - Chapter 24
Episode in
Fire Ninja
This episode looks at Volume 2 Chapter 24 of the Grenfell Phase 2 Inquiry report specifically;
1. Celotex RS5000 Insulation
A. Introduction
B. Background
i. Key Personnel & Management
ii. The Acquisition by Saint Gobain
iii. Lambda Values
iv. The Change of Polyol
C. The Development of RS5000
i. Genesis of the "Above 18m Project": 2008 - 2012
ii. Allocation to Jonathan Roper: 2012 - 2013
iii. June 2013: Business Case
iv. Celotex's Investigations during 2013
v. Sotech and IFC: June - October 2013
vi. Discussions with BRE: May and October 2013
vii. The Roper-Evans Exchange: 1st November 2013
vii. 4th November 2013 Meeting - The 5 Options
viii. The Decision to Proceed
ix. Designing the Test
x. The First Test: 14th February 2014
xi. Reaction to the First Failed Test
xii. Decision to Restest
xiii. Design Changes
xiv. No New Drawings
xv. Source of Materials
xvi. The Second Test - May 2014
xvii. BRE's Knowledge of the Design Changes
xviii. Decisions Following the Second Test
xix. The Slide Show
xx. Instructions to Produce Slides "For General Business Use"
D. BRE Draft Report
i. Discussion of the Draft Report
ii. Decision not to Correct the Report
iii. Request to Remove Figure 18
iv. Internal Review and Issue of the Report
v. Mr Clark's Involvement in the BRE Test Report
vi. The RS5000 Classification Report
vii. The Abridged Report
viii. The Marketing of RS5000
ix. The RS5000 Marketing Literature
x. The Compliance Guide
xi. The Specification Guide
xii. Other Marketing Documents
xiii. Internal Launch of RS5000
E. Aftermath of the Launch
i. Relations with NHBC
ii. Problems in the Market
iii.LABC Approval
iv. Handover to Debbie Berger
v. Contact with BRE
vi. February 2015: Market Analysis Slideshow
vii. Desktop Study (March 2015)
viii. Exova's Draft Report
ix. NHBC's Reaction
Don't forget to visit www.fireninja.info and subscribe to the newsletter for a chance to win a VIP ticket to the Fire Safety Event 2025.
01:50:08
EWS1 Follow Up - With Matt Hodges-Long
Episode in
Fire Ninja
A follow up episode looking at the last 2 weeks events regarding EWS1 forms and the reactions from industry and people affected.
If you are happy to share your story get in touch at Podcast@fireninja.info
www.fireninja.info
or you can email evidence to Matt via Help@BuildingSafetyRegister.co.uk
You can view the twitter/X conversation at the following link
https://x.com/RH_residents/status/1887822347278721196
50:12
EWS1 Follow Up - With Matt Hodges-Long
Episode in
Fire Ninja
A follow up episode looking at the last 2 weeks events regarding EWS1 forms and the reactions from industry and people affected.
If you are happy to share your story get in touch at Podcast@fireninja.info
www.fireninja.info
or you can email evidence to Matt via Help@BuildingSafetyRegister.co.uk
You can view the twitter/X conversation at the following link
https://x.com/RH_residents/status/1887822347278721196
50:12
EWS Forms - Current Social Media Coverage - With Matt Hodges-Long & Gavin Skelly
Episode in
Fire Ninja
This episode will look at the current claims surrounding Adam Kiziak of Tri Fire and Tri Fire themselves.
Matt Hodges-Long of The Building Safety Register and Trackmyrisks https://www.linkedin.com/in/matthodgeslong/
And
Gavin Skelly of Fire Aware https://www.linkedin.com/in/gavin-skelly-fciob-miconstm-afa-6126071b0/
Guest starred on this podcast. This is a developing story and as such may receive further edits.
53:56
EWS Forms - Current Social Media Coverage - With Matt Hodges-Long & Gavin Skelly
Episode in
Fire Ninja
This episode will look at the current claims surrounding Adam Kiziak of Tri Fire and Tri Fire themselves.
Matt Hodges-Long of The Building Safety Register and Trackmyrisks https://www.linkedin.com/in/matthodgeslong/
And
Gavin Skelly of Fire Aware https://www.linkedin.com/in/gavin-skelly-fciob-miconstm-afa-6126071b0/
Guest starred on this podcast. This is a developing story and as such may receive further edits.
53:56
Grenfell Phase 2 - Volume 2 - Part 3 - Chapter 23
Episode in
Fire Ninja
This episode looks at Volume 2 Chapter 23 of the Grenfell Phase 2 Inquiry report and does contain swearing specifically;
1. Certification of Kingspan K15 by LABC - Local Authority Building Control
A. Local Authority Building Control
B. LABC's Certification Schemes
C. The First Certificate for K15: May 2009 - May 2012
D. Mr Jones' Meeting with Kingspan in December 2008
E. Concerns Raised about the LABC Type Approval for K15
F. Later LABC Registered Details Certificates for K15
Don't forget to visit www.fireninja.info and subscribe to the newsletter for a chance to win a VIP ticket to the Fire Safety Event 2025.
45:45
Grenfell Phase 2 - Volume 2 - Part 3 - Chapter 23
Episode in
Fire Ninja
This episode looks at Volume 2 Chapter 23 of the Grenfell Phase 2 Inquiry report and does contain swearing specifically;
1. Certification of Kingspan K15 by LABC - Local Authority Building Control
A. Local Authority Building Control
B. LABC's Certification Schemes
C. The First Certificate for K15: May 2009 - May 2012
D. Mr Jones' Meeting with Kingspan in December 2008
E. Concerns Raised about the LABC Type Approval for K15
F. Later LABC Registered Details Certificates for K15
Don't forget to visit www.fireninja.info and subscribe to the newsletter for a chance to win a VIP ticket to the Fire Safety Event 2025.
45:45
Grenfell Phase 2 - Volume 2 - Part 3 - Chapter 22
Episode in
Fire Ninja
This episode looks at Volume 2 Chapter 22 of the Grenfell Phase 2 Inquiry report and does contain swearing specifically;
1. Kingspan K15 Insulation
A. The Use of K15 Insulation on Grenfell Tower
B. K15 - The Product
C. Early Marketing
D. Large Scale Testing: May 2005
E. Kingspan's Presentation of the 2005 Test: 2005 and 2006
F. Fire Performance Claims for New Technology K15
G. Class 0
H. The Fire Performance of New Technology K15
I. Testing in Accordance with BAS 476 Parts 6 and 7
J. Testing under BS 8414
K. The First BBA Certificate: October 2008
i. "Will not contribute to the development stages of a fire..."
ii. Class 0
iii. The BS 8414 Test in 2005
iv. "Advice should be sought from the certificate holder"
L. What the BBA did not Know
M. Amendments Proposed by the BBA: December 2008
N. Marketing and Challenges: 2008 - 2009
O. The LABC Certificate 2009
P. Amended BBA Certificates 2010 - 2013
Q. LABC, NHBC & Wintech: 2012 - 2013
R. BS 8414 Test: 2014
S. Conclusions
Don't forget to visit www.fireninja.info and subscribe to the newsletter for more big news.
01:59:10
Grenfell Phase 2 - Volume 2 - Part 3 - Chapter 22
Episode in
Fire Ninja
This episode looks at Volume 2 Chapter 22 of the Grenfell Phase 2 Inquiry report and does contain swearing specifically;
1. Kingspan K15 Insulation
A. The Use of K15 Insulation on Grenfell Tower
B. K15 - The Product
C. Early Marketing
D. Large Scale Testing: May 2005
E. Kingspan's Presentation of the 2005 Test: 2005 and 2006
F. Fire Performance Claims for New Technology K15
G. Class 0
H. The Fire Performance of New Technology K15
I. Testing in Accordance with BAS 476 Parts 6 and 7
J. Testing under BS 8414
K. The First BBA Certificate: October 2008
i. "Will not contribute to the development stages of a fire..."
ii. Class 0
iii. The BS 8414 Test in 2005
iv. "Advice should be sought from the certificate holder"
L. What the BBA did not Know
M. Amendments Proposed by the BBA: December 2008
N. Marketing and Challenges: 2008 - 2009
O. The LABC Certificate 2009
P. Amended BBA Certificates 2010 - 2013
Q. LABC, NHBC & Wintech: 2012 - 2013
R. BS 8414 Test: 2014
S. Conclusions
Don't forget to visit www.fireninja.info and subscribe to the newsletter for more big news.
01:59:10
Grenfell Phase 2 - Volume 2 - Part 3 - Chapter 21
Episode in
Fire Ninja
This episode looks at Volume 2 Chapter 21 of the Grenfell Phase 2 Inquiry report speifically;
1. The Review of The Reynobond Certificate
A. The BBA's Review Processes: An Overview
B. The Agreement with CSTB
C. Review Project 2011
D. Arconic Reynobond PE Testing in 2011
E. Review Project: 2013-2015
F. Maria Barbeito's Attempts to Review the Certificate: October 2013 - September 2014
G. Valentina Amoroso's Review: September 2014 - January 2015
H. Arconic's Submissions on the Review
I. Reissue Contract 2015
J. Review Project 2016
K. Technical Reissue: 2016 - 2017
L. Reissue September 2017
M. The Discovery of Reynobond PE & FR Test Reports
Don't forget to visit www.fireninja.info and subscribe for behind the scenes content
40:13
Grenfell Phase 2 - Volume 2 - Part 3 - Chapter 21
Episode in
Fire Ninja
This episode looks at Volume 2 Chapter 21 of the Grenfell Phase 2 Inquiry report speifically;
1. The Review of The Reynobond Certificate
A. The BBA's Review Processes: An Overview
B. The Agreement with CSTB
C. Review Project 2011
D. Arconic Reynobond PE Testing in 2011
E. Review Project: 2013-2015
F. Maria Barbeito's Attempts to Review the Certificate: October 2013 - September 2014
G. Valentina Amoroso's Review: September 2014 - January 2015
H. Arconic's Submissions on the Review
I. Reissue Contract 2015
J. Review Project 2016
K. Technical Reissue: 2016 - 2017
L. Reissue September 2017
M. The Discovery of Reynobond PE & FR Test Reports
Don't forget to visit www.fireninja.info and subscribe for behind the scenes content
40:13
Grenfell Phase 2 - Volume 2 - Part 3 - Chapters 19 & 20
Episode in
Fire Ninja
This episode looks at Volume 2 Chapters 19 and 20 of the Grenfell Phase 2 Inquiry report.
1. Chapter 19 - The BBA Certificate for Reynobond 55 PE
A. The Product
B. Behaviour in Relation to Fire
i) Section 6.1
ii) Sections 6.2 and 6.3: Class 0
C) The BBA's Evidence
D) Mr Wehrle's Statements
E) Section 6.3: The Unexposed Face of the Product
F) Section 6.4: Colour
G) Section 6.5: Resistance to Fire
2. Chapter 20 - Subsequent Testing & Marketing of Reynobond 55 PE
A. The Fred-Roderick Pohl Presentation: September 2007
B. Internal & External Communications: 2009 - 2010
C. Further Testing & Review
i) CSTB Testing: June 2010
ii) CSTB Testing of Reynobond 55 PE in Casette Form: 2011
D. The First BBA Review: February - July 2011
E. Concentrating on the UK Market: July 2011
F. The Tamwheel Tower Fire: November 2012
G. The Al Hafeet Fire & Monitoring of Projects
H. Supply by Arconic for use at Grenfell Tower
I. Further Testing & Classification: 2013 - 2014
J. Claude Wehrle's Message of 3 February 2014
K. The Lacrosse Fire: November 2014
L. The BBA Review: 2013 - 2015
M. Further Testing by CSTB: October - December 2014
N. Testing of Reynobond 55 PE with a Black Core: 2015
O. Arctics Involvement in the Supply of Reynobond 55 PE for use at Grenfell Tower: 2015
P. Arctics Reaction to Cladding Fires Overseas: 2015 - 2016
i) Fire at The King Fahd Medical Centre in Riyadh: October 2015
ii) The Address Dubai: 31 December 2015
iii) Place De Hagenau: January 2016
Don't forget to visit www.fireninja.info and subscribe for behind the scenes content
01:08:42
Grenfell Phase 2 - Volume 2 - Part 3 - Chapters 19 & 20
Episode in
Fire Ninja
This episode looks at Volume 2 Chapters 19 and 20 of the Grenfell Phase 2 Inquiry report.
1. Chapter 19 - The BBA Certificate for Reynobond 55 PE
A. The Product
B. Behaviour in Relation to Fire
i) Section 6.1
ii) Sections 6.2 and 6.3: Class 0
C) The BBA's Evidence
D) Mr Wehrle's Statements
E) Section 6.3: The Unexposed Face of the Product
F) Section 6.4: Colour
G) Section 6.5: Resistance to Fire
2. Chapter 20 - Subsequent Testing & Marketing of Reynobond 55 PE
A. The Fred-Roderick Pohl Presentation: September 2007
B. Internal & External Communications: 2009 - 2010
C. Further Testing & Review
i) CSTB Testing: June 2010
ii) CSTB Testing of Reynobond 55 PE in Casette Form: 2011
D. The First BBA Review: February - July 2011
E. Concentrating on the UK Market: July 2011
F. The Tamwheel Tower Fire: November 2012
G. The Al Hafeet Fire & Monitoring of Projects
H. Supply by Arconic for use at Grenfell Tower
I. Further Testing & Classification: 2013 - 2014
J. Claude Wehrle's Message of 3 February 2014
K. The Lacrosse Fire: November 2014
L. The BBA Review: 2013 - 2015
M. Further Testing by CSTB: October - December 2014
N. Testing of Reynobond 55 PE with a Black Core: 2015
O. Arctics Involvement in the Supply of Reynobond 55 PE for use at Grenfell Tower: 2015
P. Arctics Reaction to Cladding Fires Overseas: 2015 - 2016
i) Fire at The King Fahd Medical Centre in Riyadh: October 2015
ii) The Address Dubai: 31 December 2015
iii) Place De Hagenau: January 2016
Don't forget to visit www.fireninja.info and subscribe for behind the scenes content
01:08:42
Grenfell Phase 2 - Volume 2 - Part 3 - Chapters 15, 16, 17 & 18
Episode in
Fire Ninja
This episode looks at Volume 2 Chapters 15, 16, 17 and 18 of the Grenfell Phase 2 Inquiry report.
1. Part 3: The Testing & Marketing of Products
2. Chapter 15 - Introduction to Part 3
3. Chapter 16 - Arconic - Evidential Matters
A. The French Blocking Statute
B. The Gathering of Documents & Witness Statements
C. Gathering Evidence from Arconics Employees
4. Chapter 17 - Arconics Testing of ACM Panels 1997 - 2006
A. January 1997: Reynobond 160 PE
B. July 2006: Colin Southgate's Warnings
C. European Testing: 2004 - 2006
i) December 2004: Tests 5A & 5B
ii) Test 5A
iii) Test 5B
iv) 2003 - 2006 Tests on Reynobond 55 FR (Riveted Form)
5) Chapter 18 - Obtaining a BBA Certificate for Reynobond 55 PE
A. The Application to the BBA: August 2006
B. Negotiations Between Arconic & The BBA
C. Arconics Contract with the BBA: March 2007
D. Arconics Further Provision of test Data to the BBA: May - November 2007
E. Drafting & Issuing of the BBA Certificate: October 2007 - January 2008
Don't forget to visit www.fireninja.info and subscribe for behind the scenes content
53:34
Grenfell Phase 2 - Volume 2 - Part 3 - Chapters 15, 16, 17 & 18
Episode in
Fire Ninja
This episode looks at Volume 2 Chapters 15, 16, 17 and 18 of the Grenfell Phase 2 Inquiry report.
1. Part 3: The Testing & Marketing of Products
2. Chapter 15 - Introduction to Part 3
3. Chapter 16 - Arconic - Evidential Matters
A. The French Blocking Statute
B. The Gathering of Documents & Witness Statements
C. Gathering Evidence from Arconics Employees
4. Chapter 17 - Arconics Testing of ACM Panels 1997 - 2006
A. January 1997: Reynobond 160 PE
B. July 2006: Colin Southgate's Warnings
C. European Testing: 2004 - 2006
i) December 2004: Tests 5A & 5B
ii) Test 5A
iii) Test 5B
iv) 2003 - 2006 Tests on Reynobond 55 FR (Riveted Form)
5) Chapter 18 - Obtaining a BBA Certificate for Reynobond 55 PE
A. The Application to the BBA: August 2006
B. Negotiations Between Arconic & The BBA
C. Arconics Contract with the BBA: March 2007
D. Arconics Further Provision of test Data to the BBA: May - November 2007
E. Drafting & Issuing of the BBA Certificate: October 2007 - January 2008
Don't forget to visit www.fireninja.info and subscribe for behind the scenes content
53:34
Grenfell Phase 2 - Volume 1 - Part 2 - Chapter 13 & Chapter 14
Episode in
Fire Ninja
This episode looks at Volume 1 Chapters 13 & 14 of the Grenfell Phase 2 Inquiry report.
Chapter 13: The Fire Safety Order
Chapter 14: The Local Government Association Guide
22:28
You may also like View more
WORLDCAST
Hosted by: Pedro Buerbaum. Nuevo podcast cada lunes y jueves. Conversaciones sin cortes, filtros ni guiones. Todo tipo de invitados.
Síguenos en nuestras redes sociales:
-Youtube: https://www.youtube.com/@worldcast_
-Instagram: https://www.instagram.com/worldcast_/
-Tik tok: https://www.tiktok.com/@worldcast.oficial Updated
El Canal del Coronel
CANAL OFICIAL. El análisis geopolítico del Coronel Pedro Baños.
El mundo no es como te lo cuentan.
En este podcast, el Coronel Pedro Baños desvela las claves ocultas de la geopolítica, los intereses reales de las grandes potencias y las estrategias que están redefiniendo el orden mundial.
Conflictos, guerras, economía, inteligencia y poder global explicados de forma clara, directa y sin filtros.
Si quieres entender qué está pasando realmente —y qué pasará en el futuro— este podcast es para ti. Updated
ROCA PROJECT
Un Podcast para personas que buscan inspiración, aprendizaje y crecimiento personal. En Roca Project, Carlos Roca pone el foco en el valor humano conversando, sin filtros y en profundidad, con expertos, personajes influyentes y personas anónimas con una historia impactante que contar. Si buscas un podcast que te entretenga pero que además te aporte valor, este es tu podcast. Todos los miércoles a las 19:30 horas. Updated